
VAN LOON’S HERRINGBONE – WITH GROWTH IN MIND
CALL TODAY FOR BETA SERVICE
24/7 Servicing - Call Ziggy 021 394 555This new 24 aside herringbone was fitted by Ziggy over the Christmas months and built with the future in mind. Installed with the can set at the entry end of the shed allowing an easy extension when cow numbers increase. Installed with swing arms for later cup remover placement and tri clover unions on the milk line for flow indicators. This shed was easily pieced together with some second hand componentry that was superseded from the customers other sheds.
Forward planning is the key.